UTE WATER PROJECTS

Priske, Dave
Dave Priske

District Engineer

Lyon, Jeremy
Jeremy Lyon

Project Engineer

Eklund, John
John Eklund

Project Engineer

SOUTHSIDE TRANSMISSION REPLACEMENT - SCHEDULE H

The project consists of installation of approximately 11,000 feet of 30-inchwelded steel pipe, including connection to existing mains and other miscellaneous work as
described in the Contract Documents.

PRE-BID MEETING 

Mandatory 

TBD

BID DATE

TBD

OXBOW ROAD WATERLINE REPLACEMENT

The project consists of removal and installation of approximately 1,100 feet of 6-inch Asbestos Cement (AC) and C900 PVC pipe, respectively, between F 3/10 Rd and F 1/2 Rd; including installation of fire hydrants, connection to existing mains and services, and other miscellaneous work as described in the Contract Documents.

PRE-BID MEETING 

Mandatory 

May 16, 2024

Intersection of Oxbow Rd and F 3/10 Road 

BID DATE

May 23, 2024

Ute Water - 2190 H ¼ Road

10 ROAD WATERLINE REPLACEMENT

The project consists of installation of approximately 6,400 feet of 8-inch C900 PVC pipe, including installationof fire hydrants, connection to existing mains and services, and other miscellaneous work as described in the Contract Documents.

PRE-BID MEETING 

Mandatory 

March 28, 2024 

Intersection of 10 Road and Q 3/4 Road 

BID DATE

April 4, 2024

Ute Water - 2190 H ¼ Road

F 1/2 ROAD PARKWAY - PHASE 1

The project consists of installation of approximately 1,700 feet of 8-inch C900 PVC pipe, approximately 400 feet of 12-inch C900 PVC pipe and approximately 150 feet of 10-inch C900 PVC pipe, including installation of fire hydrants, connection to existing mains and services, and other miscellaneous work as described in the Contract Documents.

PRE-BID MEETING 

Mandatory 

July 13, 2023

Intersection of Market Street and F 1/2 Road

BID DATE

July 20, 2023

Ute Water - 2190 H ¼ Road